About Common Geometry Resources

The Common Geometry Resources corresponds to the set of resources necessary for handling the session grid, the reference planes and the reference geometry.

Related Topics
About Project Resource Management
Assigning PRM Resources
Associating Resources with Projects

The table below lists the type and format of setup data items in Common Geometry Resources.

Name Type Format Description
Reference Plane System Document XML Defines plane system definition used for reference.
Common Geometry Reference PLM Reference PLM Reference Defines common geometry reference.

Specify the session grid name in the SessionGridname box. This grid is considered as the default grid in your structure functional design session.

Common Reference Surface PLM Reference PLM Reference Defines common reference surface.

Specify the reference surface name in the ReferenceSurfaceName box. This surface is considered as the default surface in your structure functional design session.

Note: It is not mandatory to set all these resources.

Tip: The sample resource files are located at ...\startup\EquipmentAndSystems\CommonGeometryResource.