Select .
Select the de-synchronized link and click Synchronize.
This synchronizes the external link, and marks the pointing element (e.g. the text attribute) as being not-up-to-date.
In the specification tree, right-click the layout and select Local Update.
This synchronizes the external link, and marks the pointing element (e.g. the text attribute) as being not-up-to-date.
The pointing element (e.g. the text attribute) is now updated to reflect the latest changes.
Note:
Only the layout is updated. In the event the 3D shape representation itself contains links to external objects, these will not be updated.